Mayflower Delivers 500 Tonne Crane Bridles for British Steel

When British Steel needed a replacement 500 Tonne crane bridle at its Scunthorpe plant, Mayflower Engineering were the first port of call to manufacture this Critical Infrastructure Replacement​

Crane Bridles

This essential lifting equipment is responsible for safely handling ladles containing hundreds of tonnes of molten steel.​

The bridles operate in one of the most demanding industrial environments, where failure is simply not an option. The margin for error is zero when dealing with molten steel.

Challenges

The delivery of the bridles was critical; installation had to be timed to coincide with the annual plant shutdown. This created significant time pressures for the project. Mayflower’s agile project management and in-house capabilities enabled completion of the project in a condensed time period.

Engineering

Using its engineering knowledge and technical know-how, Mayflower worked closely with the engineering team from British steel to ensure that the engineering design was checked and fully compliant with Lifting Operations and Lifting Equipment Regulations (LOLER), ensuring legal and operational safety standards

Manufacture

Mayflowers highly skilled workforce built the crane bridles In-house, fabricating the units using advanced welding and machining capabilities, maintaining rigorous quality control throughout the process.​

Load Testing

Mayflower verified the integrity of the crane bridles using specialised load testing procedures and techniques before delivery, validating performance under real-world conditions.​